Products
Marin
Sloop
TIBLE Anchor
Bridge
FALL DOWN PREVENTION DEVICE
Stay Cable
External Cable
SEEE Cable
Our main cable, SEEE Cable consists of PC strands conformed to JIS G 3536 and other standards. Large capacity SEEE Cable is slimmer than other cable systems by twisting with 7 or 19 mono PC strands again. The cable is assembled with polyethylene coating and anchorages in our factory.
Factory
Yamaguchi Factory and R&D Laboratory
Location | 3-42, Sayama, Yamaguchi-shi, Yamaguchi-ken, 754-0894, Japan |
---|---|
Area | 37,000 m2 |
Building area | 10,000 m2 |
Employee | 70 |
Capacity | 5000 MT/Year |
Yamaguchi factory has been approved to ISO 9001:2015 and ISO 14001:2015.
Manufacture of prestressing steel wire cables and accessories.
Manufacturing Process
- 1. Stranding
- 2. Tensile Test
- 3.Coating
- 4. Measuring
- 5. Swaging
- 6. Threading
- 7. Delivery
Assembling line and tensile test machine



